Skip to content
PortalBase

Free template

An overhead crane inspection checklist for the operator.

Check the crane before the first lift of the shift. Do it per the maker's manual and the current standard. Print the sheet or save it as a PDF.

Also calledBridge crane inspection, Overhead crane pre-use check, Crane daily inspection, Hoist inspection checklist

How to use it

Three habits that make it worth filling out.

  1. Step 1

    Check before the first lift

    Run the crane empty first. Move it in every direction, then raise and lower the hook.

  2. Step 2

    Don't use a failed crane

    Tag it out of service, lock it out if needed, and tell your lead. A crane with a bad hook, latch or brake doesn't lift.

  3. Step 3

    Follow the maker's manual

    The manual and the current standard set what gets inspected and how often. This sheet covers the operator's pre-use check.

Do this on a phone instead of paper.

Run this check on a phone, with a photo on any failed step, no signal needed. A failed step opens a repair and the record is kept for you.

Get new free tools by email.

A new template, calculator or guide when we publish one. No spam, and you can leave any time.

Common questions

How often should an overhead crane be inspected?
Before use, and on a longer schedule by a qualified person. The maker's manual and the current standard set the schedule and what each inspection covers. Check them for your crane.
Who can inspect an overhead crane?
The operator does the pre-use check. Periodic and annual inspections go to a qualified person, per your procedure and the current standard.
What should I do if a limit switch doesn't work?
Stop. Don't lift. Tag the crane out of service and report it. Never rely on the limit switch to stop the hook in normal use.