Skip to content
PortalBase

Free template

A crane and rigging checklist for the crew before the lift.

Check the rigging, the crane and the ground before anything leaves the deck. Print the sheet or save it as a PDF.

Also calledRigging inspection checklist, Mobile crane pre-use inspection, Overhead crane daily check, Crane pre-lift checklist

How to use it

Three habits that make it worth filling out.

  1. Step 1

    Check the gear first

    Look at every sling, shackle and hook in your hands before it goes on the load. Gear with a missing tag or damage stays off the lift.

  2. Step 2

    Read the load chart for this setup

    The chart depends on the crane, the boom position and how it's set up. Use the one in the cab and follow the maker's manual.

  3. Step 3

    Stop the lift if anything changes

    A new wind, a soft spot or a person in the swing path means you stop, fix it and start again.

Do this on a phone instead of paper.

Run this check on a phone, with a photo on any failed step, no signal needed. A failed step opens a repair and the record is kept for you.

Get new free tools by email.

A new template, calculator or guide when we publish one. No spam, and you can leave any time.

Common questions

How often should rigging be inspected?
Look at it before each use. Periodic inspections are separate and follow the current standard, the maker's instructions and your own program. Many sites also have a qualified person do a documented inspection on a schedule.
Who can give signals to a crane operator?
A trained and qualified signal person, named before the lift. The operator should know who it is. Anyone can give a stop signal. Check the current rule and your procedures for who qualifies.
Does this cover overhead cranes?
As a starting point, yes. It's written for a mobile or overhead crane in general. Your crane's manual decides what must be checked and how often, so add or remove lines to match.