Line startup checklist
Area and safety
PassFailN/A- Area is clear, clean and free of tools and loose parts
- Guards are in place and interlocks work
- Emergency stops are tested and work
- Lockout is off and everyone who locked out has signed off
- Walkways and exits are clear
Setup
PassFailN/A- Materials and components are staged and are the right ones
- Tooling and fixtures match the job
- Settings match the work order
- Gauges and instruments are in place and ready
- Scrap and reject bins are empty and labeled
Handover and start
PassFailN/A- Handover notes from the last shift are read
- Open issues or defects from the last shift are known
- People on the line are briefed on the job and the hazards
- First piece is checked and passes before the run continues
- Lead is told the line is up
Defects found and action taken