Skip to content
PortalBase

Free template

A pre-task plan the crew walks through before the work.

Name the task, the steps, the hazard at each step and who handles the control. Everyone on the crew reads it and signs. Print the sheet or save it as a PDF.

Also calledPre-task planning form, PTP form, Task planning sheet, Pre-job plan

How to use it

Three habits that make it worth filling out.

  1. Step 1

    Plan it with the crew

    Walk the work area together. The person doing the step usually knows the hazard best.

  2. Step 2

    Pick a name for each control

    Put one person on each control. A control that belongs to everyone belongs to nobody.

  3. Step 3

    Set the stop points up front

    Agree on what stops the job, like a change in the work or a person in the swing zone. Then nobody has to argue it mid-task.

Do this on a phone instead of paper.

Fill out the pre-task plan on a phone, with every crew member signing on the screen. It works with no signal and the record is kept for you.

Get new free tools by email.

A new template, calculator or guide when we publish one. No spam, and you can leave any time.

Common questions

What is a pre-task plan?
A short plan the crew reviews before starting a task. It lists the steps, the hazards and the controls. It's closely related to a JSA or JHA, and some sites use the names interchangeably.
How is a pre-task plan different from a JSA?
Mostly in size and timing. A pre-task plan is often a one-page daily review of the task at hand. A JSA is often a fuller analysis of a job. Your company procedure decides which you need.
When do we redo the plan?
When the task, the crew, the area or the conditions change. A plan for the morning's work doesn't cover the afternoon's if the work changed.